top of page


Natural Gas Odorant Tank Sizing: Inputs and Planning Factors
Plan odorant tank capacity using gas demand, the approved injection basis, refill interval, reserve capacity and containment requirements.


Safe Odorant Handling in Populated Areas with Temporary Negative Pressure Enclosures
Review how temporary negative-pressure enclosures, ventilation, filtration, work boundaries and monitoring can support odorant-vapor control.


Burgess Pipeline Services: Expert Odorant Cylinder Handling & Safety Guide
Review planning considerations for odorant cylinders, including current SDS information, storage, transfer boundaries, inspection and trained personnel.


Enhance Safety with Weatherproof Labels for Natural Gas Odorants
Review odorant-container and equipment labeling considerations, including current SDS information, durable materials, site conditions and operator procedures.


Odorant Tank Secondary Containment: Planning Factors
Review capacity, drainage, material compatibility, site layout, inspection access and project responsibilities when planning odorant tank secondary containment.


Natural Gas Odorant Spill Kits: Planning and Typical Contents
Review odorant-spill-kit planning, including current SDS information, compatible absorbents, PPE, waste containers, response boundaries and replenishment.


Odorant Transfer Process and Procedure
Review odorant-transfer planning, responsibilities, current SDS information, containment, vapor control, inventory records and turnover documentation.


Odorant Disposal: Ensuring Safety and Compliance with Burgess Pipeline Services
Plan odorant disposal around material identification, current SDS information, approved containers, qualified vendors, waste records and site responsibilities.


SPCC Applicability and Planning for Odorization Sites
Review information operators may need when evaluating SPCC applicability for an odorization site, including storage, containment, drainage and records.


Liquid Odorant Handling: Precautionary Measures and SDS Planning
Review general precautions for liquid odorant handling and why the current manufacturer SDS, site hazard assessment, training, and emergency plan govern the work.


Spill Scenarios in Odorization Systems: Causes, Prevention, and Response
Review odorant spill scenarios, preventive controls, response planning, current SDS information, escalation and post-incident documentation.


Natural Gas Odorant Station Design Considerations
Review odorant-station design considerations including containment, ventilation, access, material compatibility, instrumentation, maintenance and site requirements.


Transporting Natural Gas Odorants: Planning and Documentation
Review odorant-transportation planning considerations including material identification, packaging, shipping papers, hazard communication, placarding and trained personnel.


Odorization Equipment Depressurization: Planning and Work Controls
Review planning considerations for depressurizing odorization equipment, including equipment procedures, isolation, pressure verification, vapor control and records.


Ensuring Safety and Compliance: Designing Odorizer Buildings
Review odorizer-building planning for ventilation, containment, access, electrical classification, monitoring, maintenance and site-specific requirements.
bottom of page
