top of page

Closed-Loop Static Pipeline Pickling Without Planned Flaring or Venting

  • Jan 19, 2025
  • 2 min read

Updated: Jul 26

Zero Emission Static Pickling





Burgess Pipeline Services uses a closed-loop static conditioning approach intended to keep gas and odorant contained during the approved project sequence. The objective is controlled odorant exposure and downstream verification without planned flaring or venting when site conditions and project configuration support that approach.


Understanding Static Pickling for Odorization

Static pickling, also called static pipeline conditioning, exposes an isolated natural-gas pipeline segment to odorant under controlled conditions. The project team defines isolation, pressure control, exposure, monitoring, sampling, acceptance, and turnover requirements.


Closed-Loop Static Pickling Objective

The system is configured to keep gas and odorant within the closed-loop project equipment. This can reduce planned atmospheric releases, but actual emissions depend on connections, equipment condition, procedures, abnormal events, and project execution and should not be represented as zero under every circumstance.


Eliminating Flaring and Venting

When the approved project configuration permits, the closed-loop approach can avoid planned flaring or venting. The project plan still needs defined isolation, pressure control, containment, monitoring, abnormal-condition response, verification, and documentation.


Innovation at Its Core

BPS designs and integrates the equipment and operating sequence used for its closed-loop static conditioning projects. Capabilities should be evaluated against the documented project configuration; no first, proprietary, industry-only, or guaranteed-performance claim is asserted here.


Closed-Loop Static Pickling Project Considerations

  • Conditioning objective: Define the pipeline segment, odorant basis, exposure approach, and downstream acceptance criteria.

  • Closed-loop configuration: Document how gas and odorant remain contained and when planned flaring or venting can be avoided.

  • Verification: Identify representative sample locations, measurements, trends, and records needed for operator review.

  • Operational boundary: BPS provides project execution support and documentation, not legal advice or a guarantee of emissions, compliance, or odorant performance.


Closed-loop static pipeline conditioning can support projects seeking controlled odorant exposure without planned flaring or venting. Suitability and results remain project-specific and must be verified through the approved monitoring and turnover plan.