top of page

The BPS New Pipeline Odorization Unit is designed for new natural gas pipeline projects that need temporary odorant injection during startup, commissioning, pickling, or conditioning. New pipeline systems can absorb odorant during early operation, which may create low downstream odorant readings until the pipe is properly conditioned.

This portable odorization unit provides controlled, flow-proportional odorant injection upstream of the new pipe section so operators can support odorant breakthrough, odor fade prevention, and downstream verification before normal service begins.

The system is useful for new steel mains, PE distribution extensions, replacement pipeline sections, campus gas systems, RNG interconnect piping, and construction projects where permanent odorization equipment is not yet active or not positioned for the conditioning work.

SEO-Focused Applications

  • New pipeline odorization unit
  • Temporary odorization for new gas mains
  • Pipeline commissioning and conditioning
  • Odor fade prevention for new pipe
  • Downstream odorant verification before service

Shared Equipment Capabilities

The odorizer uses continuous, non-pulsating odorant injection, precision odorant flow measurement, high-pressure operation up to 1500 PSI, remote monitoring capability, and a portable field-deployable design for temporary natural gas odorization projects.

BPS New Pipeline Odorization Unit

$37,680.98Price
Quantity
bottom of page